Published by Bradfieldson,Bradfields's Tankersley,Updated on
Tankersley
At a site near Tankersley, we were appointed to design and construct a 1-hour-fire-rated, vault-like structure to house the client’s new silo system. This was a critical part of the client’s production process for pre-fabricated polystyrene buildings. The structure also needed to meet strict fire safety requirements and allow for both immediate installation and future maintenance access.
View Full Resource
"*" indicates required fields
Quick Links
- What a Mezzanine Supplier Should Understand Before They Quote
- How Warehouse Zones Shape Productivity, Safety, and Space
- From Empty Unit to Working Warehouse: What to Plan Before You Move In
- Are You Planning a Mezzanine, or Planning the Space Around It?
- Why Warehouse Fit-Out Projects Go Over Budget
- Why a Mezzanine Project Often Involves More than the Floor
Related Resources
A Guide to AMR/AGV Mezzanine Floors
Redesigning Warehouse Floor Prints to Accommodate the Rise of AMRs.
A Guide to Retail Mezzanine Floors
A strategic guide for UK retailers to maximise existing footprint, [...]